Quick Updates
- 13 March 2004 - Turned new frame spacers
- October 2003 - Bolted the frame together
- 3rd August 2003 - Cutto length and started drilling the holes in the frame support angles.
- 21st July 2003 - Collected the frames from the Lasercutters. A very nice job done indeed. Will get them to cut some W-Irons once I've measured the frames up properly.
- 16th July 2003 - The laser cutter called and advised costs of the side frames. I've authorsed a set of frames in 5mm mild steel.
Update History
|