Before the cylinders can be bolted to the frames the connecting
steam pipes need to be cut to length and firmly screwed into
the cylinder block (exhaust) and valve chamber ("live").
When these are cut to length and both cylinders offered together
on the frames there should be onought room for the tee pieces
to be fitted in place.